Development of preliminary studies
a research which determines the feasibility and the limitations to be considered in each project’s development. |

Design schematics development
in which, by means of architectural ground plans, it is possible to visualize elevations, cross sections, three dimensional renderings and the architectonic nature of the activity program indicated by the customer. |

Assembling of construction drawings and documents
which are the project’s formal and documented development, prepared by a multidisciplinary group of professionals. These are necessary besides the purpose of obtaining the respective building permissions, preparing the budget and cost of construction, information for the bidding process, they become the documental technical information for the execution of the construction. |

Specs preparation
technical guide with instructions for the builder, with respect to the selection of materials, construction methods, equipment and labor to be used during the construction process.
|

Development of bids
process by which possible contractors of the project are selected and the contractual terms and conditions are set for the construction company |

Technical inspection visits
to each project in its construction phase, in order to verify that each detail is executed according to what is indicated in the plans and specifications. |

Budget preparation
two for each project; a global one during the schematic design phase and the other, a detailed closer to the real cost, against the preparation of the construction drawings. |

Interior design
which ranges from the design of furniture, development of specific architectural details, lighting design, up to the selection of the scale of colors, finishing materials and textures. |

Landscaping
professionals in landscaping, experts in exterior design, to reach an agreement with the specific architecture of each project and its immediate environment. |

Master Planning
a scale representation of the project through the use of architectonic expression, in order to obtain a plan of distribution or zones, where proportions of constructed areas versus green zones and parking areas are established, maximizing and optimizing the allocated program. |